Project: “Construction of line infrastructure construction open canal on
catchments with its partial closure and mixing of the route from the intersection
with st. Lavchanski road through the 15th corps, through SRU 1 in ARM 1 beside
Stadium next to Bukovski Cemetery – Part 4 – Municipality of Bitola ”

Client: Ministry of Transport and Communications

Short description of the contract:
Total length of the route L = 2051.91 m
– Rehabilitation of an existing canal in the length of L = 1140.85 m; Cleaning and
waterproofing;
– Closing of the existing channel in length of L = 343.77 m; Reinforced
concrete channel with rectangular cross section;
– Reconstruction of an existing canal in the length of L = 193.88 m;
Removal of existing canal and construction of a new one in its place;
– Relocation of an existing canal in the length of L = 373.41 m;
Dislocation and construction of a new reinforced concrete channel with
rectangular cross section;